KSKS Security Research
Learning map / Session 3 / Scenes 06–07, 17

ORCHESTRATOR 05 · ROADMAP

Prove the current state.Earn the future state.

Communicate what is implemented now, what evidence supports it, and which controls are planned without presenting a roadmap as production reality.

roadmapcurrent statefuture stategovernance
Learning guide
Level
Applied
Reading time
9 min
Presentation
Session 3
Progress
5 of 5

01 · Mental model

A roadmap label is not implementation evidence

Current-state architecture should name the exact runtime, model integration, storage, skills, tools, policies, traces, evaluations, and deployment controls that are working now. Future-state architecture should show upgrade triggers, dependencies, risks, and acceptance evidence—not merely more product logos.

This separation protects leadership decisions, security review, and delivery planning from accidental overclaiming. It also makes technical debt and missing controls visible without diminishing the value already delivered.

02 · Visual explanation

01Prototypepossibility
02Currentverified workflow
03Hardencontrols + evals
04Scaleoperational proof
05Autonomyexplicit authority
Evidence-driven maturityCapability advances only after the previous stage produces measurable quality and control evidence.

03 · Compare and decide

Communicate architecture honestly

Decision lensCurrent stateFuture state
ClaimImplemented and verified behaviorTarget behavior with trigger and dependency
EvidenceCode, tests, trace, artifact, reviewAcceptance criteria and planned validation
TechnologyExact version and responsibilityCandidate choice with decision condition
RiskKnown limits and safe failureNew trust boundaries and migration risk

04 · Cybersecurity example

Adding durable orchestration

The current SDK loop works, but long-running reviews need resume and human approval after days.

01

Measure failed resumptions and manual coordination.

02

Define durable-state and approval requirements.

03

Evaluate graph or workflow engines against those requirements.

04

Migrate one bounded workflow with rollback.

Outcome: The future technology is adopted because a proven operational trigger appeared.

05 · What to remember

The 60-second recall

01

Separate implemented facts from roadmap intent visually and verbally.

02

Every new layer needs an upgrade trigger and acceptance evidence.

03

Future state should reduce a measured limitation, not decorate the architecture.

Teach-back prompt: Explain this concept to a teammate using the diagram, then name one failure mode and the control that stops it.

06 · Questions people ask

FAQ

Yes, when it is clearly labelled as a prototype and the demonstration is not presented as production reliability, security, or performance evidence.

07 · Primary sources

Continue with authoritative guidance